https://en.arctic.ru
All Arctic districts of Yakutia connected to heating system as the heating season begins
All Arctic districts of Yakutia connected to heating system as the heating season begins
Arctic.ru: Discover how Russia implements its development goals in the Arctic and the Far East
2026-09-09T12:51
2026-09-09T12:51
2026-09-09T16:45
news
republic of sakha (yakutia)
social affairs
infrastructure
/img/07ea/09/09/1735010_0:143:3135:1906_1920x0_80_0_0_96fa3e93fad46ae8e47c529b3877fd03.jpg
The 2026-2027 heating season has begun in 30 municipalities of the Republic of Sakha (Yakutia), including Yakutsk. Heat is supplied first to socialfacilities and then to residential buildings, according to the press service of the regional Government.As Sergei Kirov, Deputy Minister of Housing and Utilities and Energy of the Republic of Sakha (Yakutia), noted, all 116 diesel power plants and backup power-generating systems are fully prepared to handle winter loads.Heating networks are 94 percent ready, while water supply and sewerage networks are 91 percent ready. Of the region’s 1,154 boiler houses, 1,001 are ready for winter.In the remaining areas of Yakutia, heating will be switched on by the end of the week as temperatures fall.
https://en.arctic.ru/20260827/1702330.html
2026
Новости
ru-RU
https://en.arctic.ru/docs/about/copyright.html
https://xn--c1acbl2abdlkab1og.xn--p1ai/
/img/07ea/09/09/1735010_202:0:2931:2047_1920x0_80_0_0_bd1d5d2c236dd0d7c5f9c663aa22b4a3.jpgnews, republic of sakha (yakutia), social affairs , infrastructure
All Arctic districts of Yakutia connected to heating system as the heating season begins
The 2026-2027 heating season has begun in 30 municipalities of the Republic of Sakha (Yakutia), including Yakutsk. Heat is supplied first to socialfacilities and then to residential buildings, according to the press service of the regional Government.
As Sergei Kirov, Deputy Minister of Housing and Utilities and Energy of the Republic of Sakha (Yakutia), noted, all 116 diesel power plants and backup power-generating systems are fully prepared to handle winter loads.
Heating networks are 94 percent ready, while water supply and sewerage networks are 91 percent ready. Of the region’s 1,154 boiler houses, 1,001 are ready for winter.
In the remaining areas of Yakutia, heating will be switched on by the end of the week as temperatures fall.